Yilmaz H.Yilmaz M.20.04.20192019-04-2020.04.20192019-04-2020179.78099E+122169-8767https://hdl.handle.net/20.500.12403/5317th Annual Conference on Industrial Engineering and Operations Management, IEOM 2017In this paper, a new approach on multi-manned assembly line balancing problem is presented. The goal of proposed approach is to establish balance of multi-manned assembly line with minimum number of worker, workstation and resources. For this purpose, mathematical model is developed for the problem. Finally, this model is solved for a numerical example using Gurobi to indicate the applicability of the proposed mathematical model. © IEOM Society International.eninfo:eu-repo/semantics/closedAccessAssembly lineAssembly line balancing problemMathematical modellingMulti-manned assembly line balancingResource constraintAssembly lineAssembly line balancing problemMathematical modellingMulti-manned assembly line balancingResource constraintMulti-manned assembly line balancing problem: Resource constrained caseConference Object7527592-s2.0-85018955723Q4