Yazar "Anvari-Moghaddam, Amjad" seçeneğine göre listele
Listeleniyor 1 - 2 / 2
Sayfa Başına Sonuç
Sıralama seçenekleri
Öğe District heating and electricity production based on biogas produced from municipal WWTPs in Turkey: A comprehensive case study(Pergamon-Elsevier Science Ltd, 2021) Abusoglu, Aysegul; Tozlu, Alperen; Anvari-Moghaddam, AmjadIn this paper, district heating (DH) potentials of the wastewater treatment plants (WWTPs) based on their biogas, electricity, and heat productions are considered. Two district heating scenarios are developed: (i) DH Scenario I which is based on both excess biogas storage of the WWTP and exhaust gas of the cogeneration with the actual power output, (ii) DH Scenario II which is based on the exhaust gas of the cogeneration with the increased power output using all the biogas produced. In DH Scenario I, it is found that 458 dwellings can be heated via the DH system proposed considering only the waste heat of the cogeneration. In addition, the natural gas consumption of 1112 dwellings with the same annual heating load can also be met using the purified biogas. In DH Scenario II, the electricity production could be increased to 1643 kWh by burning all the biogas produced in the cogeneration plant. In this scenario, the annual heating load of 755 dwellings in Gaziantep province can be covered using the waste heat in the DH system. The payback period for the DH Scenario I is calculated as 2.5 years, while for the DH Scenario II, it is obtained as 2 years. (c) 2021 Elsevier Ltd. All rights reserved.Öğe Municipal solid waste-based district heating and electricity production: A case study(Elsevier Sci Ltd, 2021) Tozlu, Alperen; Abusoglu, Aysegul; Ozahi, Emrah; Anvari-Moghaddam, AmjadIn this paper, municipal solid waste (MSW) based electricity production and district heating (DH) potential of Turkey are considered. Three MSW based waste-to-energy (WtE) scenarios is developed: (i) Scenario-I, a DH system integrated into a gas turbine power plant (GTPP), (ii) Scenario-II, a DH system integrated into an organic Rankine cycle (ORC), and (iii) Scenario-III, which is based solely on a DH system. As a result of the thermodynamic and thermoeconomic analyzes of these developed scenarios using an existing MSW-based cogeneration facility's actual operating data, the system with the most extended payback period (about 5 years) is found as the GTPP-DH system developed in Scenario-I, which also has the highest investment cost. On the other hand, the system with the shortest payback period (about 2 years) is found as the DH system developed in Scenario-III, which also has the lowest investment cost. Overall exergy efficiencies of the GTTP-DH, ORC-DH, and DH systems are found to be 41.86%, 16.15%, and 31.87%, respectively. When the developed WtE scenarios adapted to the pilot provinces selected from each geographical region of Turkey, it is found that the GTPP system developed in Scenario-I can increase the power generation capacity of MSW plants for each province by about 20%. (C) 2021 Elsevier Ltd. All rights reserved.