Municipal solid waste-based district heating and electricity production: A case study

Küçük Resim Yok

Tarih

2021

Dergi Başlığı

Dergi ISSN

Cilt Başlığı

Yayıncı

Elsevier Sci Ltd

Erişim Hakkı

info:eu-repo/semantics/closedAccess

Özet

In this paper, municipal solid waste (MSW) based electricity production and district heating (DH) potential of Turkey are considered. Three MSW based waste-to-energy (WtE) scenarios is developed: (i) Scenario-I, a DH system integrated into a gas turbine power plant (GTPP), (ii) Scenario-II, a DH system integrated into an organic Rankine cycle (ORC), and (iii) Scenario-III, which is based solely on a DH system. As a result of the thermodynamic and thermoeconomic analyzes of these developed scenarios using an existing MSW-based cogeneration facility's actual operating data, the system with the most extended payback period (about 5 years) is found as the GTPP-DH system developed in Scenario-I, which also has the highest investment cost. On the other hand, the system with the shortest payback period (about 2 years) is found as the DH system developed in Scenario-III, which also has the lowest investment cost. Overall exergy efficiencies of the GTTP-DH, ORC-DH, and DH systems are found to be 41.86%, 16.15%, and 31.87%, respectively. When the developed WtE scenarios adapted to the pilot provinces selected from each geographical region of Turkey, it is found that the GTPP system developed in Scenario-I can increase the power generation capacity of MSW plants for each province by about 20%. (C) 2021 Elsevier Ltd. All rights reserved.

Açıklama

Anahtar Kelimeler

Municipal solid waste, Power production, District heating, Thermodynamic, Thermoeconomic

Kaynak

Journal of Cleaner Production

WoS Q Değeri

Q1

Scopus Q Değeri

Q1

Cilt

297

Sayı

Künye