Multi-manned assembly line balancing problem: Resource constrained case

Küçük Resim Yok

Tarih

2017

Dergi Başlığı

Dergi ISSN

Cilt Başlığı

Yayıncı

IEOM Society

Erişim Hakkı

info:eu-repo/semantics/closedAccess

Özet

In this paper, a new approach on multi-manned assembly line balancing problem is presented. The goal of proposed approach is to establish balance of multi-manned assembly line with minimum number of worker, workstation and resources. For this purpose, mathematical model is developed for the problem. Finally, this model is solved for a numerical example using Gurobi to indicate the applicability of the proposed mathematical model. © IEOM Society International.

Açıklama

7th Annual Conference on Industrial Engineering and Operations Management, IEOM 2017

Anahtar Kelimeler

Assembly line, Assembly line balancing problem, Mathematical modelling, Multi-manned assembly line balancing, Resource constraint, Assembly line, Assembly line balancing problem, Mathematical modelling, Multi-manned assembly line balancing, Resource constraint

Kaynak

Proceedings of the International Conference on Industrial Engineering and Operations Management

WoS Q Değeri

Scopus Q Değeri

Q4

Cilt

Sayı

Künye