Prioritising and selecting the railway routes planned in the Eastern Black Sea Region with the AHP and TOPSIS methods

dc.authoridBOZ, Ediz/0000-0002-4824-4739
dc.contributor.authorBoz, Ediz
dc.contributor.authorTurk, Ersin
dc.contributor.authorTogan, Vedat
dc.date.accessioned2024-10-04T18:52:42Z
dc.date.available2024-10-04T18:52:42Z
dc.date.issued2023
dc.departmentBayburt Üniversitesien_US
dc.description.abstractThe construction of the railway, which is needed for the development of the Eastern Black Sea Region, is an issue that has been discussed and unresolved for about 110 years. The geomorphological structure of the region and the developments in the highway played a role in the delay of the railway construction. However, the developing technology in the railway, Turkey's being a part of the Iron Silk Road Project, and the agreements made with international connections have brought the railway construction to the region again. In the Environmental Plan (EP) approved and in force by the Ministry of Environment, Urbanization and Climate Change, four railway routes are planned to integrate the Eastern Black Sea region with the national/international railway network. These routes are; Samsun-Sarp, Trabzon-Erzincan, Of -Erzurum and Tirebolu-Bayburt. However, some of these routes are alternatives to each other and are not feasible and rational since the implementation of all planned routes requires great costs. The aim of this study is to develop a method for prioritizing and selecting the railway routes planned in the EP. Within the scope of this purpose, by using Analytical Hierarchy Process (AHP) and TOPSIS techniques, which are multi-criteria decision making methods, the routes were listed according to 4 criteria and 10 sub-criteria determined with the help of literature and expert team. As a result of the study; In both techniques, the order was the same and it was determined that the Samsun-Sarp railway was the most priority railway route. Trabzon-Erzincan came second, Of-Erzurum came third and Tirebolu-Bayburt came fourth.en_US
dc.identifier.doi10.5505/pajes.2022.72437
dc.identifier.endpage627en_US
dc.identifier.issn1300-7009
dc.identifier.issn2147-5881
dc.identifier.issue6en_US
dc.identifier.startpage617en_US
dc.identifier.urihttps://doi.org/10.5505/pajes.2022.72437
dc.identifier.urihttp://hdl.handle.net/20.500.12403/3622
dc.identifier.volume29en_US
dc.identifier.wosWOS:001106632300005en_US
dc.identifier.wosqualityQ4en_US
dc.indekslendigikaynakWeb of Scienceen_US
dc.language.isoenen_US
dc.publisherPamukkale Univen_US
dc.relation.ispartofPamukkale University Journal of Engineering Sciences-Pamukkale Universitesi Muhendislik Bilimleri Dergisien_US
dc.relation.publicationcategoryMakale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanıen_US
dc.rightsinfo:eu-repo/semantics/openAccessen_US
dc.subjectMulticriteria decision makingen_US
dc.subjectAnalytic hierarchy processen_US
dc.subjectTOPSISen_US
dc.subjectRoute planningen_US
dc.subjectRailwayen_US
dc.titlePrioritising and selecting the railway routes planned in the Eastern Black Sea Region with the AHP and TOPSIS methodsen_US
dc.typeArticleen_US